Policy     Economics     Technologies

Extending public charging infrastructure up to 2020

Estimate of the number of public charging points required for electric cars

To encourage use of electric vehicles, roll-out of a good charging infrastructure is essential. Besides private, semi-public and fast-charging points, public charging points also have a large role to play and in the last few years the number of such points has increased substantially. An important question, though, is how many new ones will be needed before 2020 to meet the demand set by the growing number of electric vehicles. A second question is whether the number of such points will automatically follow rising trends in the number of electric cars because market parties see it as an earning opportunity, or whether the business case is not yet sufficiently appealing.

In this report we answer both questions, based on calculations using the CELINE model, which, by making assumptions about such parameters as the number of vehicles, electric driving distance and spread across charging options (home, semi-public, fast),calculates demand from the bottom up.

Authors CE

Maarten Afman
Anouk van Grinsven
Anco Hoen

Delft, February 2017

Extending public charging infrastructure up to 2020 (only available in Dutch)

Contact person:   Anco Hoen  

Tweets by @cedelft

NPO-radio 1 interviewde Geert Bergsma voor de rubriek Feit of Fictie over de stelling: Uitbreiding statiegeld breng… https://t.co/YUU7Z8azAe
11-01-2018 10:06

Rapport - Milieuprijzen afval, voor gebruik in de Milieubarometer https://t.co/WuMB4vlkwK https://t.co/7iE3uyY0mN
10-01-2018 11:54

Rapport - Mini MKBA 100.000 hectare extra bos in Nederland https://t.co/Ct0TUbZRpd
10-01-2018 11:19

CE Delft nieuwjaarswens 2018 https://t.co/Wg7qJFj6Kp https://t.co/aKvNPvFVw4
04-01-2018 16:14

Rapport: Innovatie #afvalverwerkingstechnieken doorgelicht: https://t.co/BdEHcW51pE
20-12-2017 16:28